EV charging
EV charger electrical permit packet
A 48 A or 60 A charger can push a tight 100 A service past its rating. The packet runs the charger through Article 220, shows the breaker on the panel schedule, and draws it on the one-line so you can see whether the calculated load fits the existing service.
Demand, not just nameplate
The engine applies the EV demand rules in the 2025 CEC, including load management when you mark the circuit as EMS-managed. That is the difference between a set that calls for a 200 A upgrade and one that keeps the existing main.
Fleet and multifamily chargers belong on the commercial or multifamily path, where the calc uses the occupancy and unit count instead of a single-family optional method.
What ships in the packet
Every job produces six 11×17 sheets: cover, general electrical notes, single line diagram, panel schedules, electrical load calculation, and utility service data. The title block carries your company, license, and revision history.
A residential set is $89. Multifamily and commercial are priced from unit count and floor area. Corrections and re-downloads stay free on that job.
PermitPak is not an engineering firm. Documents are not PE-stamped. Approval is not guaranteed.
Express-permit single-family jobs typically need no stamp. LADBS electrical plan check (new load over 400 A, equipment 600 A or more, solar/battery beyond standard plans, 3+ units, commercial) needs a California electrical engineer or, in limited cases, the installing C-10. Not legal advice.
PermitPak is not affiliated with or endorsed by LADBS, LADWP, SCE, or any city, county, or utility.