Electrical permit sets, drafted in minutes

Focus on the job,not the paperwork.

Walk the project in like you would with your estimator: address, scope, loads, service. PermitPak drafts the six core electrical sheets under your title block — load calc, panel schedules, single line diagram, and the utility form, per the 2025 CEC.

Built for C-10 contractors, licensed engineers, and owner-builders on their own homes in LA, Burbank, Glendale, Pasadena, Santa Monica, and LA County.

E-1.0 Single line diagramNot to scale
Single line diagram drawn by PermitPakUtility service drop through the meter and main disconnect into a 200 amp panel, with a subpanel, EV circuit, solar inverter, battery storage, and a grounding electrode system.LADWPMETER200A/2PPANEL 'A'PANEL 'B'PV 6.0 kWESS 13.5 kWhEV 48AGES
Does your service fit the calculated load?CEC 220.82
Add the loads on this job
Service size

Mostly ADUs and garage subpanels now — rarely enough for a whole house.

81AFits a 100A service

Calculated per CEC 220.82 from your inputs; your building department makes the determination.

See the full set

Public tool

Click a license number

Type the digits and click the stamp. This only checks whether it looks like a CSLB license number. It does not say the license is active.

Open the full check

Not an official verification. PermitPak does not retrieve license records. The full page also looks up a City of Los Angeles electrical permit number.

Every packet ships these six sheets

The six core electrical sheets for your submittal, not a calculator printout.

E-0.0Cover sheet
E-0.0 Cover sheet
E-0.1General electrical notes
E-0.1 General electrical notes
E-1.0Single line diagram
E-1.0 Single line diagram
E-2.0Panel schedules
E-2.0 Panel schedules
E-3.0Electrical load calculation
E-3.0 Electrical load calculation
E-4.0Utility service data
E-4.0 Utility service data

Real output from the drawing engine, at 11×17, under your title block, license, and revision history.

Minutes of input, not an evening in CAD

Less drafting, better margins

Draft every submittal faster.

Minutes of answering questions instead of an evening in CAD.

The set is generated from the job facts you already know.

Cut the drafting work.

Calc, schedules and one-line are generated together, so you don't redraw three sheets.

One set of inputs feeds every sheet.

Keep the margin on the job.

A residential set is $89.

Drafting services commonly quote $350–$1,500+ for similar sets (our 2026 survey).

The $89 residential price is our current list price. The $350–$1,500+ range is what drafting services commonly quoted for similar sets in our 2026 survey. Your own figures depend on your rate and scope. PermitPak does not affect city review time.

How PermitPak works

Answer the job, get the set.

The same questions you would answer for your estimator. No CAD, no template hunting, no re-typing the address on six sheets.

About five minutes

  1. [01]

    Address and jurisdiction

    Type the address. PermitPak picks up the AHJ, the serving utility, and the code edition that applies, so the set is drafted to the code edition and local amendments for that address.

  2. [02]

    Scope and building

    New, addition or remodel, or a service upgrade. Occupancy, floor area, and unit count decide which Article 220 method the engine is allowed to use.

  3. [03]

    Loads

    Pick from the appliance catalog, or photograph your handwritten notes and let the scan fill the list. Nothing advances until you confirm what it read.

  4. [04]

    Panels

    Main and subpanels, bus and main breaker sizes, locations. This is what becomes the panel schedule sheet and the one-line.

  5. [05]

    Service

    Voltage, overhead or underground, copper or aluminium. The engine calculates conductor, neutral, ground and conduit sizes from CEC tables for your review.

  6. [06]

    Generate and unlock

    Six sheets under your title block. Unlock the clean PDF for this job, or go Pro for unlimited projects. When plan check sends a correction, fix the note, bump the revision, and download again. Plan-check corrections and re-downloads on the same job are free.

Inside the set

Every number carries its citation.

Plan check does not have to take your word for it, and neither do you. This is what the sheets actually look like.

E-3.0 Load calculation

Demand factors, cited line by line

Every row shows connected VA, the demand factor applied, and the code reference behind it. The method is chosen by the engine and named on the sheet.

E-2.0 Panel schedules

Schedules that match the one-line

Circuits, breakers, and VA per pole, with connected totals and phase imbalance worked out. Generated from the same data as the diagram, so the numbers stay consistent across sheets.

E-0.0 Cover sheet

A document ID anyone can check

Each set carries an ID and a verify link. Anybody holding the paper can confirm the address, the calculated load, and the preparer against PermitPak's document record.

Pricing

What a permit set costs.

A residential set is $89. Commercial is priced by floor area. Plan-check corrections and re-downloads on the same job are free. Changing the address or scope is a new set.

Launch offer: 35% off your first set with code LAUNCH35 through Dec 31, 2026.

First residential set per account. Regular price $89.

ResidentialPer project

from $89

Single-family, ADU, service upgrades, and multifamily — priced by unit count.

CommercialPer project

from $149

TI, retail, office, warehouse — priced from the floor area on your set.

Residential & multifamily

  • Residential

    Single-family, ADU, service upgrade, addition or remodel.

    $89

  • Multifamily, 2–10 units

    Duplex through small apartment. Full NEC 220.84 set with per-unit schedules.

    $199

  • Multifamily, 11+ units

    Larger apartment projects.

    $349

Commercial — by floor area

A pizza shop and a big-box TI don't pay the same. Priced from the square footage on your set.

Commercial sets for C-10 contractors on work they install, or for engineers who review and stamp.

  • Under 2,500 sq ft

    Small TI, cafe, and local retail.

    $149

  • 2,500–9,999 sq ft

    Standard office, retail, light commercial.

    $299

  • 10,000–24,999 sq ft

    Larger TI, warehouse, multi-tenant shell.

    $449

  • 25,000+ sq ft

    Big box, campus, major commercial.

    $598

Your project's price is set by its own occupancy, unit count, and floor area. If the scope grows mid-permit, you pay only the difference.

Need hard copies? Printed 11×17 sets are $25 each — same-day pickup, or $35 ground shipping. Order by 4:30 PM PT.

Subscriptions

Pro

$199/mo

or $1,599/yr paid upfront (save 33%)

Unlimited projects, every tier, all corrections. One user.

Firm

$399/mo

Starting at 3 users

For shops: shared projects, your company on every title block, seats for the crew.

Contact us

FAQ

Questions plan check asks too

Who is PermitPak for?

C-10 electrical contractors, licensed engineers, and owner-builders pulling electrical permits on their own homes — mostly residential, ADU, service upgrades, multifamily, and light commercial tenant improvements that the contractor installs.

Who signs the set?

You do, as the named preparer. PermitPak is not an engineering firm and does not stamp sets. Your building department makes all permit decisions; approval is not guaranteed.

When is an engineer required?

PermitPak is not an engineering firm and does not stamp documents. Single-family express-permit jobs — panel swaps, service upgrades up to 400 A, EV chargers, ADU subpanels — typically do not need stamped plans. Jobs that need LADBS electrical plan check — new load over 400 A, equipment 600 A or more, solar or battery beyond LADBS standard plans, 3 or more dwelling units, commercial or special occupancies — need plans signed by a California electrical engineer or, in limited cases, the licensed C-10 contractor installing the work. Your building department decides; approval is not guaranteed. This is general information, not legal advice.

Can a homeowner use PermitPak?

Yes, if you are pulling an electrical permit as an owner-builder on your own home — a service upgrade, ADU, EV charger, or solar. Express-permit single-family jobs typically do not need a stamp. If the job needs LADBS electrical plan check, an owner-builder cannot sign the plans. Your local department decides what they accept. You are the named preparer and stand behind the inputs. PermitPak drafts the set; it does not stamp it or guarantee approval. Put Owner-Builder in the title block. A contractor license number is not required to generate the packet.

Which jurisdictions are covered?

Los Angeles and nearby cities — LADBS, Burbank, Glendale, Pasadena, Santa Monica, and unincorporated LA County, plus other basin cities on the coverage list. The serving utility is set by the address: LADWP in the City of Los Angeles, Burbank Water and Power, Glendale Water and Power, Pasadena Water and Power, and Southern California Edison for the County and Santa Monica.

What happens when plan check sends corrections?

Fix the note, bump the revision, and download the whole set again. Plan-check corrections and re-downloads on the same job are free (up to 5 rebuilds within 30 days). The address and project type stay locked after purchase. Changing the address or scope is a new job.

What is in a packet?

Six 11×17 sheets: cover, general electrical notes, single line diagram, panel schedules, electrical load calculation, and utility service data.

Which code edition is used?

The 2025 California Electrical Code, plus the local amendments for the jurisdiction on the project. The editions applied are printed on the cover sheet.

What is the document ID on each sheet?

Every generated set carries an ID and a verify link. Anyone holding a copy can check the address, calculated load, and preparer against PermitPak's document record, which makes an altered set easy to spot.

When do I pay?

After you generate the set. A residential packet is $89; commercial is priced from the floor area. Unlock that exact job, or subscribe to Pro for unlimited projects. Plan-check corrections and re-downloads on the same job are free.

Can I get printed sets?

Yes. Printed 11×17 sets are $25 each, with same-day office pickup or $35 ground shipping. Order by 4:30 PM Pacific and we print and pack the same day.

Run one project and unlock the set.

Create an account, walk a job in, and pay for the clean PDF on that address. Corrections and re-downloads stay free.

Plan-check corrections and re-downloads on the same job are free.