Electrical permit sets, drafted in minutes

Focus on the job,not the paperwork.

Walk the project in like you would with your estimator: address, scope, loads, service. PermitPak drafts the full submittal set under your title block — load calc, panel schedules, single line diagram, and the utility form, per the 2025 CEC.

Built for C-10s, designers, and PEs pulling electrical permits in LA, Burbank, Glendale, Pasadena, and LA County.

E-1.0 Single line diagramNot to scale
Single line diagram drawn by PermitPakUtility service drop through the meter and main disconnect into a 200 amp panel, with a subpanel, EV circuit, solar inverter, battery storage, and a grounding electrode system.LADWPMETER200A/2PPANEL 'A'PANEL 'B'PV 6.0 kWESS 13.5 kWhEV 48AGES
Will your service pass?CEC 220.82
Add the loads on this job
Service size

Mostly ADUs and garage subpanels now — rarely enough for a whole house.

0AFits a 100A service

Real CEC 220.82 math, from the same engine that drafts your set.

See the full set

Every packet ships these six sheets

A complete submittal set, not a calculator printout.

E-0.0Cover sheet
E-0.0 Cover sheet
E-0.1General electrical notes
E-0.1 General electrical notes
E-1.0Single line diagram
E-1.0 Single line diagram
E-2.0Panel schedules
E-2.0 Panel schedules
E-3.0Electrical load calculation
E-3.0 Electrical load calculation
E-4.0Utility service data
E-4.0 Utility service data

Real output from the drawing engine, at 11×17, under your title block, license, and revision history.

Minutes instead of days

Faster permitting, better margins

Accelerate every submittal.

0X

faster to a plan-check-ready set.

Minutes of answering questions instead of an evening in CAD.

Cut the drafting work.

0%

less time drawing, checking, and re-checking.

The calc, the schedules, and the one-line are generated together from one set of inputs.

Keep the margin on the job.

0X

return against what a shop charges to draft the same set.

$89 for a residential set, against the $350 to $1,500 a drafting shop bills.

Comparisons are against drafting a set by hand or sending it out. A residential set is $89 against the $350 to $1,500 drafting shops typically charge — roughly 4X at the low end and past 15X at the high end, so 5X is the conservative middle. Your own figures depend on your rate and scope.

How PermitPak works

Answer the job, get the set.

The same questions you would answer for your estimator. No CAD, no template hunting, no re-typing the address on six sheets.

About five minutes

  1. [01]

    Address and jurisdiction

    Type the address. PermitPak picks up the AHJ, the serving utility, and the code edition that applies, so the set is drafted to the right rules from the first sheet.

  2. [02]

    Scope and building

    New, addition or remodel, or a service upgrade. Occupancy, floor area, and unit count decide which Article 220 method the engine is allowed to use.

  3. [03]

    Loads

    Pick from the appliance catalog, or photograph your handwritten notes and let the scan fill the list. Nothing advances until you confirm what it read.

  4. [04]

    Panels

    Main and subpanels, bus and main breaker sizes, locations. This is what becomes the panel schedule sheet and the one-line.

  5. [05]

    Service

    Voltage, overhead or underground, copper or aluminium. The engine sizes the conductors, the neutral, the ground, and the conduit.

  6. [06]

    Generate and unlock

    Six sheets under your title block. Unlock the clean PDF for this job, or go Pro for unlimited projects. When plan check sends a correction, fix the note, bump the revision, and download again.

Inside the set

Every number carries its citation.

Plan check does not have to take your word for it, and neither do you. This is what the sheets actually look like.

E-3.0 Load calculation

Demand factors, cited line by line

Every row shows connected VA, the demand factor applied, and the code reference behind it. The method is chosen by the engine and named on the sheet.

E-2.0 Panel schedules

Schedules that match the one-line

Circuits, breakers, and VA per pole, with connected totals and phase imbalance worked out. Generated from the same data as the diagram, so the two cannot disagree.

E-0.0 Cover sheet

A document ID anyone can check

Each set carries an ID and a verify link. Anybody holding the paper can confirm the address, the calculated load, and the preparer against the issued record.

Pricing

What a permit set costs.

Priced by the job, like your own quotes. Every project includes unlimited corrections and re-downloads. Shops charge $350 to $1,500+ to draft these same sets.

  • Under 2,500 sq ft

    Small TI, cafe, local retail. Impulse price.

    $149

  • 2,500–9,999 sq ft

    Standard office, retail, light commercial.

    $299

  • 10,000–24,999 sq ft

    Larger TI, warehouse, multi-tenant shell.

    $449

  • 25,000+ sq ft

    Big box, campus, major commercial. Still under a PE day rate.

    $598

Your project's price is set by its own occupancy, unit count, and floor area. If the scope grows mid-permit, you pay only the difference.

Subscriptions

Pro

$199/mo

or $1,599/yr paid upfront (save 33%)

Unlimited projects, every tier, all corrections. One user.

Firm

$399/mo

Starting at 3 users

For shops: shared projects, your company on every title block, seats for the crew.

Contact us

FAQ

Questions plan check asks too

Who is PermitPak for?

C-10 electrical contractors, designers, and engineers pulling electrical permits — mostly residential, ADU, service upgrades, multifamily, and light commercial tenant improvements.

Who signs and stamps the set?

You do. PermitPak drafts the set under your title block and license. As the named preparer, the inputs and field conditions are yours to stand behind, the same as any set that leaves your office.

Which jurisdictions are covered?

Los Angeles and the surrounding area — LADBS, Burbank, Glendale, Pasadena, and unincorporated LA County — with LADWP as the serving utility on the utility sheet.

What happens when plan check sends corrections?

Fix the note, bump the revision, and download the whole set again. Revisions are unlimited on every project and never cost extra.

What is in a packet?

Six 11×17 sheets: cover, general electrical notes, single line diagram, panel schedules, electrical load calculation, and utility service data.

Which code edition is used?

The 2025 California Electrical Code, plus the local amendments for the jurisdiction on the project. The editions applied are printed on the cover sheet.

What is the document ID on each sheet?

Every generated set carries an ID and a verify link. Anyone holding a copy can check the address, calculated load, and preparer against the record we issued, which makes an altered set easy to spot.

When do I pay?

After you generate the set. A residential packet is $89; commercial is priced from the floor area. Unlock that exact job, or subscribe to Pro for unlimited projects. Revisions on a paid set stay free.

Run one project and unlock the set.

Create an account, walk a job in, and pay for the clean PDF on that address. Corrections and re-downloads stay free.

Unlimited corrections and re-downloads on every project.