Coverage

Santa Monica Electrical Permit Packet

Santa Monica Building & Safety reviews the electrical set; Southern California Edison is the serving utility. The cover cites the 2025 CEC as adopted by the Santa Monica Municipal Code and the utility sheet is an SCE Service Planning Request.

Authority and utility on this set

Santa Monica Community Development — Building & Safety is printed as the authority having jurisdiction. Serving utility is Southern California Edison (SCE), (800) 655-4555. The utility sheet is the SCE Service Planning Request.

Code amendments on the cover: 2025 CEC as adopted by Santa Monica Municipal Code.

Westside jobs, SCE paper

ADUs, service upgrades, and EV chargers in Santa Monica use the same six-sheet packet as the rest of the basin, with the city department and SCE named so plan check is not reading an LA City cover.

What ships in the packet

Every job produces six 11×17 sheets: cover, general electrical notes, single line diagram, panel schedules, electrical load calculation, and utility service data. The title block carries your company, license, and revision history.

A residential set is $89. Multifamily and commercial are priced from unit count and floor area. Corrections and re-downloads stay free on that job.

PermitPak is not an engineering firm. Documents are not PE-stamped. Approval is not guaranteed.

Express-permit single-family jobs typically need no stamp. LADBS electrical plan check (new load over 400 A, equipment 600 A or more, solar/battery beyond standard plans, 3+ units, commercial) needs a California electrical engineer or, in limited cases, the installing C-10. Not legal advice.

PermitPak is not affiliated with or endorsed by LADBS, LADWP, SCE, or any city, county, or utility.