Coverage

LADBS Electrical Permit Packet — City of Los Angeles

Most service upgrades, ADUs, and solar jobs in the city go through LADBS, with LADWP on the utility sheet. PermitPak names the department, prints the 2026 Los Angeles Electrical Code on the cover, and fills the LADWP Service Planning Information form — including the methane-zone field on the LADWP form (from ZIMAS).

Authority and utility on this set

Los Angeles Department of Building and Safety (LADBS) is printed as the authority having jurisdiction. Serving utility is Los Angeles Department of Water and Power (LADWP), (213) 367-6937. The utility sheet is the LADWP Service Planning Information.

Code amendments on the cover: 2026 City of Los Angeles Electrical Code (LAMC Ch. IX, Art. 3). Methane zone status per ZIMAS required on LADWP service planning form.

What a consistent LADBS submittal shows

The set has to agree with itself. Calculated load, bus rating, main breaker, and the one-line must tell the same story, and every demand factor needs a CEC citation. PermitPak generates the calc, the schedules, and the diagram from one project file so the numbers stay consistent across sheets.

Los Angeles also wants the serving utility identified and the local code edition on the cover. The packet prints “City of Los Angeles — LADBS,” LADWP, and the 2026 City of Los Angeles Electrical Code (LAMC Chapter IX, Article 3) without re-typing them onto six sheets.

What ships in the packet

Every job produces six 11×17 sheets: cover, general electrical notes, single line diagram, panel schedules, electrical load calculation, and utility service data. The title block carries your company, license, and revision history.

A residential set is $89. Multifamily and commercial are priced from unit count and floor area. Corrections and re-downloads stay free on that job.

PermitPak is not an engineering firm. Documents are not PE-stamped. Approval is not guaranteed.

Express-permit single-family jobs typically need no stamp. LADBS electrical plan check (new load over 400 A, equipment 600 A or more, solar/battery beyond standard plans, 3+ units, commercial) needs a California electrical engineer or, in limited cases, the installing C-10. Not legal advice.

PermitPak is not affiliated with or endorsed by LADBS, LADWP, SCE, or any city, county, or utility.