Coverage
Burbank Electrical Permit Packet — BWP
Burbank Water and Power serves the city. Packets name Burbank Community Development — Building Division, cite the 2025 CEC as adopted by the Burbank Municipal Code, and include a BWP Electric Service Request.
Authority and utility on this set
Burbank Community Development — Building Division is printed as the authority having jurisdiction. Serving utility is Burbank Water and Power (BWP), (818) 238-3700. The utility sheet is the BWP Electric Service Request.
Code amendments on the cover: 2025 CEC as adopted by Burbank Municipal Code.
BWP on the utility sheet
Service upgrades and ADUs in Burbank can be held up when the drawings still say LADWP or SCE. The address sets BWP and the (818) 238-3700 number so the planning sheet matches the city that will take the job.
What ships in the packet
Every job produces six 11×17 sheets: cover, general electrical notes, single line diagram, panel schedules, electrical load calculation, and utility service data. The title block carries your company, license, and revision history.
A residential set is $89. Multifamily and commercial are priced from unit count and floor area. Corrections and re-downloads stay free on that job.
PermitPak is not an engineering firm. Documents are not PE-stamped. Approval is not guaranteed.
Express-permit single-family jobs typically need no stamp. LADBS electrical plan check (new load over 400 A, equipment 600 A or more, solar/battery beyond standard plans, 3+ units, commercial) needs a California electrical engineer or, in limited cases, the installing C-10. Not legal advice.
PermitPak is not affiliated with or endorsed by LADBS, LADWP, SCE, or any city, county, or utility.